Monday, October 5, 2009

The Elevator is here!! and other major progress.

As you can tell from the photos below major progress has been made since my last posting. All of the concrete board for the floors is installed and the waterproofing and floor tiles have been installed in the shower.

The elevator finally arrived this morning and they will be installing it this week. Hopefully by Friday I will be able to use it to go upstairs and see all the work for myself.

Obviously the next couple of weeks are going to be very busy and a lot of work being done.

The shower floor
The waterproofing in the shower and all of the shower controls
The in wall storage storage cubbyholes in the shower
Looks like the temporary elevator is about to become
a thing of the past
The rails for the elevator
The other operating parts for the elevator
the cabin will arrive later